Switching from 24/48 to 48/96 mid-year: six ways to line up the platoons, and which one ends in a 72-hour shift
When a department moves from 24/48 to 48/96, the new roster has to start somewhere: one platoon works the first 48 hours, another the next, the third after that. There are six ways to hand those out. We counted all six for a change on July 1, 2027, and only one of them keeps everyone at 48 hours on duty or less, with at least two days off, and the year almost even.
How we count
Which crew is A, B or C differs by department, so platoons here are numbered by the old roster: platoon 1 works the last 24/48 shift on June 30, platoon 2 would have been on duty on July 1, platoon 3 the day after. The 48/96 starts on July 1 with the first platoon in the order. “Days off” are the full days between a platoon's last 24/48 shift and its first 48/96 shift. Trades, Kelly days, overtime and how your contract counts hours are not included – this is the plain rotation.
The six ways to start, counted
| First 48s go to platoons | Days off across the change (1 · 2 · 3) | Longest on duty | Shifts in 2027 (1 · 2 · 3) |
|---|---|---|---|
| 1, 2, 3 | 0 · 4 · 5 | 72 h | 123 · 122 · 120 |
| 1, 3, 2 | 0 · 6 · 3 | 72 h | 123 · 120 · 122 |
| 2, 1, 3 | 2 · 2 · 5 | 48 h | 123 · 122 · 120 |
| 2, 3, 1 | 4 · 2 · 3 | 48 h | 121 · 122 · 122 |
| 3, 1, 2 | 2 · 6 · 1 | 48 h | 123 · 120 · 122 |
| 3, 2, 1 | 4 · 4 · 1 | 48 h | 121 · 122 · 122 |
Without the change, 24/48 would give the three platoons 122 · 122 · 121 shifts in 2027. A shift is one 24-hour duty; a 48 counts as two.
What the numbers say
- Starting with platoon 1 means 72 hours straight. In 2 of the six orders the platoon that just worked June 30 goes straight into the first 48 – three 24-hour shifts in a row, longer than either roster ever asks for.
- Some orders cut the break short instead. In 2 orders one platoon gets a single day off between its last 24 and its first 48, less than the two days 24/48 always gives.
- The year does not come out even on its own. Depending on the order, the platoons end 2027 up to 3 shifts apart – 72 hours of work for the same pay period.
- The order that keeps it fair: 2, 3, 1. The platoon due on July 1 works the first 48 and the others follow in their usual order. Days off across the change are 4, 2, 3, nobody works more than 48 hours, and the year ends at 121 · 122 · 122 shifts – still one platoon one shift short of the rest, as on a plain 24/48 year.
The days off do not depend on the date: whenever the change comes, these six orders give the same breaks. The shifts in the year do, because they depend on how many 24/48 days come before it.
Your first months on 48/96
Open 48/96 starting on July 1, pick your platoon and check it against the notice from your department. Add it to your phone calendar so the new days replace the old ones on the day of the change.
48/96 from July 1, 2027 → Compare 24/48 and 48/96 → Does 48/96 give more evenings at home? →